To enable the “Link Horizons” option, click to check the corresponding box.

Enabling this option allows you to maintain and “link” the horizons between the 2 Gantt schedules, Main and Resources. The Main Gantt, however, remains the “master” horizon, with the Resources Gantt deferring to the Main Gantt’s time frame.